Feature Requests Submissions

Mark Up Tables

Would like the ability to change the mark up table at the job level as a pre-set setting. We do a ton of work for contractors – some are bid (flat rate), some are time and material, and some are cost plus. We can perform work for the same contractor under all of these methods

Mark Up Tables Read More »